Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RSP01 -
Message number: 517
Message text: Error during determination of the checking horizon
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RSP01517
- Error during determination of the checking horizon ?The SAP error message
/SAPAPO/RSP01517
indicates that there is an issue during the determination of the checking horizon in the Advanced Planning and Optimization (APO) module. This error typically arises in the context of planning runs, where the system is unable to determine the appropriate checking horizon for the planning process.Causes:
- Configuration Issues: The checking horizon may not be properly configured in the system. This could be due to missing or incorrect settings in the planning area or in the master data.
- Master Data Problems: Incomplete or incorrect master data (like product master, location master, etc.) can lead to issues in determining the checking horizon.
- Planning Version Issues: The planning version being used may not be set up correctly, or it may not have the necessary data.
- Time Series Data: If there are gaps or inconsistencies in the time series data, it can affect the calculation of the checking horizon.
- Authorization Issues: Sometimes, lack of proper authorizations can prevent the system from accessing the necessary data to determine the checking horizon.
Solutions:
- Check Configuration: Review the configuration settings for the planning area and ensure that the checking horizon is defined correctly. This can be done in the SAP APO configuration settings.
- Validate Master Data: Ensure that all relevant master data is complete and accurate. Check the product master, location master, and any other relevant data.
- Review Planning Version: Make sure that the planning version you are using is correctly set up and contains the necessary data for the planning run.
- Examine Time Series Data: Check the time series data for any gaps or inconsistencies. Ensure that the data is complete for the periods being planned.
- Check Authorizations: Verify that the user executing the planning run has the necessary authorizations to access the required data.
Related Information:
/SAPAPO/MC62
(for checking the planning area) or /SAPAPO/MC73
(for checking the planning version) to investigate further.If the problem persists after checking these areas, it may be beneficial to consult with your SAP Basis or APO support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RSP01516
No restriction capacities available for order &1 in plant &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RSP01515
Error during scheduling using production calendar &1
What causes this issue? An error occurred during scheduling using the production calendar &V1&, that you have defined for the location. This ...
/SAPAPO/RSP01518
Order &1 was deallocated
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RSP01519
Desired date for rescheduling: &1 (order &2)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.