Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RSP01 -
Message number: 401
Message text: Upper date limit is less than current date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RSP01401
- Upper date limit is less than current date ?The SAP error message
/SAPAPO/RSP01401 Upper date limit is less than current date
typically occurs in the context of SAP Advanced Planning and Optimization (APO) when a date range specified for a planning run or a report is invalid. Specifically, it indicates that the upper date limit set for the planning horizon is earlier than the current date, which is not permissible.Cause:
- Incorrect Date Range: The upper date limit for the planning run or report is set to a date that is earlier than today's date.
- Configuration Issues: The planning horizon settings in the system may not be configured correctly, leading to an invalid date range.
- User Input Error: The user may have manually entered an incorrect date range when initiating the planning run or report.
Solution:
- Check Date Settings: Review the date settings in the planning run or report. Ensure that the upper date limit is set to a date that is equal to or later than the current date.
- Adjust Planning Horizon: If the planning horizon is configured in the system, check the settings in the relevant configuration transaction (e.g.,
/SAPAPO/SDP1
for SNP or/SAPAPO/MC90
for DP) and adjust the upper limit accordingly.- User Input Validation: If the date range is being entered manually, ensure that users are trained to input valid date ranges. Implement validation checks if possible.
- System Date Check: Ensure that the system date is correct. If the system date is incorrect, it may lead to confusion regarding valid date ranges.
Related Information:
/SAPAPO/SDP1
, /SAPAPO/MC90
, and others depending on the specific module you are working with.By following these steps, you should be able to resolve the error and ensure that your planning runs and reports are executed successfully.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RSP01400
*** Messages liveCache-Test ***
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RSP01303
Enter a check mode
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RSP01402
Mass scheduling without restrictions matrices is not possible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RSP01403
Restrictions matrix does not exist for material &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.