Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RSP -
Message number: 871
Message text: The start date of the evaluation has been corrected
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RSP871
- The start date of the evaluation has been corrected ?The SAP error message
/SAPAPO/RSP871 The start date of the evaluation has been corrected
typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there is an issue with the date parameters set for a planning evaluation or report. This message indicates that the system has automatically adjusted the start date of the evaluation to ensure that it falls within a valid range.Cause:
- Invalid Date Range: The start date specified for the evaluation is earlier than the allowed date range for the planning data or is not aligned with the planning horizon defined in the system.
- Planning Horizon Settings: The planning horizon may not cover the specified start date, leading the system to correct it to a valid date.
- Data Availability: There may be no data available for the specified start date, prompting the system to adjust it to a date where data is available.
Solution:
- Check Date Parameters: Review the start date and end date parameters you are using for the evaluation. Ensure that they are within the valid planning horizon defined in your APO system.
- Adjust Planning Horizon: If necessary, adjust the planning horizon settings in the APO configuration to include the desired start date.
- Review Data Availability: Ensure that there is relevant planning data available for the specified date range. If data is missing, you may need to load or generate the necessary data.
- Consult Documentation: Refer to the SAP documentation or help resources for specific details on how to set up and manage planning evaluations correctly.
Related Information:
/SAPAPO/DP
for Demand Planning or /SAPAPO/SNP
for Supply Network Planning.By following these steps, you should be able to address the error message and ensure that your planning evaluations are set up correctly.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RSP870
*** Messages for Evaluations *******
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RSP865
POSMAPN restored for proposed order &1 package &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RSP872
The end date of the evaluation has been corrected
What causes this issue? The evaluation is based on time series in the liveCache. The end date is corrected if the time series do not cover the comple...
/SAPAPO/RSP873
There are no liveCache time series for the period in question
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.