How To Fix /SAPAPO/RSP811 - Processing was canceled due to resource problems


/SAPAPO/RSP811 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/RSP -

  • Message number: 811

  • Message text: Processing was canceled due to resource problems

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RSP811 - Processing was canceled due to resource problems ?
    The SAP error message /SAPAPO/RSP811 Processing was canceled due to resource problems typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there are issues related to system resources during the execution of planning runs or other resource-intensive processes. Here’s a breakdown of the potential causes, solutions, and related information:
    Causes:
    
    Insufficient Memory: The system may not have enough memory (RAM) allocated to handle the processing requirements of the APO planning run.
    High Load on the System: If the system is under heavy load due to multiple concurrent processes, it may not be able to allocate the necessary resources for your specific task.
    
    Configuration Issues: Incorrect configuration settings in APO or the underlying SAP system can lead to resource allocation problems. Database Performance: Slow database performance or locks on database tables can also lead to resource issues. Long-running Processes: If a process takes too long to execute, it may be terminated by the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant