How To Fix /SAPAPO/RSP787 - Daily package creation has been executed for the horizon &1 to &2


/SAPAPO/RSP787 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/RSP -

  • Message number: 787

  • Message text: Daily package creation has been executed for the horizon &1 to &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RSP787 - Daily package creation has been executed for the horizon &1 to &2 ?
    The SAP error message /SAPAPO/RSP787 typically indicates that the daily package creation process has been executed for a specified time horizon. This message is part of the SAP Advanced Planning and Optimization (APO) module, which is used for supply chain planning.
    
    Cause: The error message /SAPAPO/RSP787 is not necessarily an error in the traditional sense but rather an informational message indicating that the daily package creation process has been completed for the specified time horizon. The message includes two parameters: &1: Start date/time of the horizon. &2: End date/time of the horizon. This message can appear in various scenarios, such as: When the daily planning run has been executed. When the system is processing data for a specific planning horizon.
    Solution: Since this message is informational, there is typically no action required unless you are experiencing issues with the planning process. However, if you are looking to address any related concerns, consider the following steps: Check Planning Results: Review the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker