How To Fix /SAPAPO/RSP036 - Order &1 was successfully scheduled to &2 in plant &3


/SAPAPO/RSP036 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/RSP -

  • Message number: 036

  • Message text: Order &1 was successfully scheduled to &2 in plant &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RSP036 - Order &1 was successfully scheduled to &2 in plant &3 ?
    The SAP error message /SAPAPO/RSP036 indicates that an order was successfully scheduled in a specific plant, but it may also imply that there are issues related to the scheduling or planning process that need to be addressed. Here’s a breakdown of the cause, potential solutions, and related information for this message:
    
    Cause: Scheduling Conflicts: The order may have been scheduled, but there could be conflicts with other orders, resources, or capacity constraints in the plant. Resource Availability: The resources required for the order may not be available at the scheduled time, leading to potential delays or issues in production. Master Data Issues: There may be inconsistencies or missing information in the master data (e.g., material master, resource master) that could affect scheduling. Capacity Planning: The capacity of the plant or specific work centers may not be sufficient to handle the scheduled order, leading to warnings or errors.
    Solution: Check Scheduling Details: Review the scheduling details of the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker