Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP_PT -
Message number: 655
Message text: Lot size &1 is larger than the maximum lot size in production version &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_PT655
- Lot size &1 is larger than the maximum lot size in production version &2 ?The SAP error message
/SAPAPO/RRP_PT655 Lot size &1 is larger than the maximum lot size in production version &2
typically occurs in the context of Advanced Planning and Optimization (APO) when there is a discrepancy between the lot size defined in the planning run and the maximum lot size specified in the production version of a material.Cause:
Lot Size Configuration: The lot size being proposed for production or procurement is greater than the maximum lot size defined in the production version for that material. This can happen if:
- The planning parameters have been set incorrectly.
- The production version has not been updated to reflect the current planning requirements.
- There are changes in demand that exceed the maximum lot size.
Production Version Settings: The production version may have specific constraints that limit the maximum lot size, which is not aligned with the current planning run.
Solution:
Review Production Version:
- Check the production version for the material in question. Go to the transaction code
C223
(orC201
for creating/updating production versions) and verify the maximum lot size defined.- If necessary, adjust the maximum lot size in the production version to accommodate the planned lot size.
Adjust Planning Parameters:
- Review the planning parameters in the APO system. Ensure that the lot size settings in the planning book or the key figure settings are appropriate for the production version.
- You may need to adjust the lot size settings in the planning profile or the planning strategy.
Change Demand or Supply:
- If the demand has changed significantly, consider adjusting the demand management settings or the forecast to align with the production capabilities.
Consult Documentation:
- Review SAP documentation or consult with your SAP support team for specific configurations related to lot sizes and production versions.
Related Information:
Transaction Codes:
C223
: Display/Change Production VersionsC201
: Create/Change Production VersionsMD04
: Stock/Requirements List (to check demand and supply)Lot Size Types: Understand the different types of lot sizes (e.g., fixed lot size, minimum lot size, maximum lot size) and how they are configured in your system.
APO Configuration: Familiarize yourself with the APO configuration settings related to lot sizing and production planning.
SAP Notes: Check for any relevant SAP Notes that might address specific issues or bugs related to this error message.
By following these steps, you should be able to resolve the error and ensure that your planning runs align with the production capabilities defined in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP_PT653
Lot size &1 is smaller than the minimum lot size in production version &2
What causes this issue? The specified quantity &V1& is smaller than the minimum lot size &V2& in the production version.System Respon...
/SAPAPO/RRP_PT652
No source of supply selected
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_PT656
The source of supply is not an iPPE object
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_PT657
An error has occurred as the BAdI /SAPAPO/ppt_bottlen was implemented
What causes this issue? You have implemented the BAdI <LS>/SAPAPO/PPT_BOTTLEN</>. This implementation has not been successful. The activi...
Click on this link to search all SAP messages.