How To Fix /SAPAPO/RRP_PT655 - Lot size &1 is larger than the maximum lot size in production version &2


/SAPAPO/RRP_PT655 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/RRP_PT -

  • Message number: 655

  • Message text: Lot size &1 is larger than the maximum lot size in production version &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RRP_PT655 - Lot size &1 is larger than the maximum lot size in production version &2 ?
    The SAP error message /SAPAPO/RRP_PT655 Lot size &1 is larger than the maximum lot size in production version &2 typically occurs in the context of Advanced Planning and Optimization (APO) when there is a discrepancy between the lot size defined in the planning run and the maximum lot size specified in the production version of a material.
    
    Cause: Lot Size Configuration: The lot size being proposed for production or procurement is greater than the maximum lot size defined in the production version for that material. This can happen if: The planning parameters have been set incorrectly. The production version has not been updated to reflect the current planning requirements. There are changes in demand that exceed the maximum lot size. Production Version Settings: The production version may have specific constraints that limit the maximum lot size, which is not aligned with the current planning run.
    Solution: Review Production Version: Check the production version for the material in question. Go

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author