Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP_PT -
Message number: 605
Message text: Orders were moved to subsequent periods
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_PT605
- Orders were moved to subsequent periods ?The SAP error message
/SAPAPO/RRP_PT605
indicates that certain orders in the system have been moved to subsequent periods. This typically occurs in the context of Advanced Planning and Optimization (APO) when there are constraints or issues that prevent the orders from being executed in their originally planned periods.Cause:
- Capacity Constraints: The most common reason for this error is that there are not enough resources (e.g., production capacity, labor, or machine availability) to fulfill the orders in the planned period.
- Material Shortages: If the required materials are not available in the planned period, the system may push the orders to a later period.
- Planning Parameters: Incorrect planning parameters or settings in the APO system can lead to this issue.
- Order Prioritization: If there are higher-priority orders that need to be fulfilled, the system may reschedule lower-priority orders to later periods.
- Changes in Demand: Fluctuations in demand can also lead to the rescheduling of orders.
Solution:
- Check Capacity: Review the capacity planning in the system to ensure that there are enough resources available in the planned period. Adjust capacity if necessary.
- Material Availability: Verify the availability of materials required for the orders. If there are shortages, consider expediting procurement or adjusting the production schedule.
- Review Planning Parameters: Check the planning parameters and settings in the APO system to ensure they are configured correctly.
- Prioritize Orders: If applicable, adjust the prioritization of orders to ensure that critical orders are fulfilled on time.
- Adjust Planning Horizon: If the planning horizon is too short, consider extending it to allow for better scheduling of orders.
- Re-run the Planning Run: After making necessary adjustments, re-run the planning run to see if the orders can be scheduled in the desired periods.
Related Information:
/SAPAPO/RRP3
to analyze the order details and see why they were rescheduled.By following these steps, you should be able to identify the root cause of the error and implement a solution to prevent orders from being moved to subsequent periods in the future.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP_PT604
Update not complete
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_PT603
Could not create all of the orders in liveCache
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_PT606
Orders were moved to previous periods
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_PT607
Finite scheduling impossible for all orders
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.