How To Fix /SAPAPO/RRP_PT135 - Assign either sched.agrmt(&1) or del. sched.(&2) to days'supply type (&3)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/RRP_PT -

  • Message number: 135

  • Message text: Assign either sched.agrmt(&1) or del. sched.(&2) to days'supply type (&3)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RRP_PT135 - Assign either sched.agrmt(&1) or del. sched.(&2) to days'supply type (&3) ?

    The SAP error message /SAPAPO/RRP_PT135 typically occurs in the context of Advanced Planning and Optimization (APO) when there is an issue with the configuration of supply types in the system. This error indicates that the system requires either a scheduling agreement or a delivery schedule to be assigned to a specific days' supply type.

    Cause:

    The error is triggered when:

    1. A days' supply type is being used in a planning run or a related process, but it does not have a corresponding scheduling agreement or delivery schedule assigned to it.
    2. The configuration for the supply type is incomplete or incorrect, leading to the system being unable to find the necessary data to perform the planning operation.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check Configuration:

      • Go to the configuration settings for the days' supply type in the APO system.
      • Ensure that the days' supply type is correctly configured to reference either a scheduling agreement or a delivery schedule.
    2. Assign Scheduling Agreement or Delivery Schedule:

      • If you have a scheduling agreement or delivery schedule that should be linked to the days' supply type, make sure it is properly assigned.
      • You can do this in the relevant transaction codes (e.g., /SAPAPO/SDP94 for scheduling agreements or /SAPAPO/SDP95 for delivery schedules).
    3. Review Master Data:

      • Check the master data for the materials involved. Ensure that the materials have the necessary supply chain data set up, including the correct days' supply type.
      • Verify that the relevant supply chain objects (like products, locations, etc.) are correctly maintained.
    4. Consult Documentation:

      • Review SAP documentation or help resources for specific details on how to configure days' supply types and their relationships with scheduling agreements and delivery schedules.
    5. Testing:

      • After making the necessary changes, run a test planning run to see if the error persists. Monitor the logs for any additional errors or warnings.

    Related Information:

    • Transaction Codes:

      • /SAPAPO/SDP94 - For managing scheduling agreements.
      • /SAPAPO/SDP95 - For managing delivery schedules.
      • /SAPAPO/RRP3 - For planning board where you can see the planning results.
    • SAP Notes:

      • Check for any relevant SAP Notes that might address this specific error or provide additional guidance on configuration.
    • Support:

      • If the issue persists after following the above steps, consider reaching out to your SAP support team or consulting with an SAP APO expert for further assistance.

    By following these steps, you should be able to resolve the error and ensure that your days' supply type is correctly configured in the SAP APO system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant