How To Fix /SAPAPO/RRP_PT085 - Activity from order &1 could not be scheduled on resource &2


/SAPAPO/RRP_PT085 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/RRP_PT -

  • Message number: 085

  • Message text: Activity from order &1 could not be scheduled on resource &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RRP_PT085 - Activity from order &1 could not be scheduled on resource &2 ?
    The SAP error message /SAPAPO/RRP_PT085 indicates that an activity from a production order could not be scheduled on a specified resource. This error typically arises in the context of Advanced Planning and Optimization (APO) within SAP, particularly when dealing with production planning and scheduling.
    Causes:
    
    Resource Availability: The resource (e.g., machine, labor) may not be available during the required time frame for the activity.
    Capacity Constraints: The resource may have reached its capacity limits, preventing additional activities from being scheduled.
    Incorrect Resource Settings: The resource may not be properly configured in the system, such as missing or incorrect capacity data.
    Order Status: The production order may be in a status that does not allow scheduling (e.g., if it is already completed or canceled).
    Scheduling Parameters: The scheduling parameters for the order or resource may not be set correctly, leading to conflicts.
    Dependencies: There may be dependencies or constraints that prevent the scheduling of the activity on the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant