Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP_PT -
Message number: 078
Message text: Period of examination is greater than &1 days --> performance
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_PT078
- Period of examination is greater than &1 days --> performance ?The SAP error message
/SAPAPO/RRP_PT078
indicates that the period of examination specified in a planning or reporting transaction is greater than the allowed limit (in this case, greater than &1 days). This is a performance-related warning that suggests that processing a large time frame could lead to performance issues, such as slow response times or system overload.Cause:
- Excessive Time Frame: The user has selected a time frame for analysis or planning that exceeds the system's recommended limits.
- System Configuration: The system may be configured to limit the number of days for performance reasons, and the user’s selection exceeds this limit.
- Data Volume: The volume of data being processed over a long period can lead to performance degradation.
Solution:
- Reduce the Time Frame: Adjust the period of examination to be within the recommended limits. For example, if the limit is 30 days, try to restrict your selection to 30 days or less.
- Batch Processing: If you need to analyze a longer period, consider breaking it down into smaller segments and processing them one at a time.
- Check System Settings: Consult with your SAP Basis or system administrator to understand the configured limits and whether they can be adjusted based on your system's performance capabilities.
- Optimize Queries: If you are running queries or reports, ensure they are optimized to handle large datasets efficiently.
Related Information:
If the problem persists after trying the above solutions, it may be beneficial to engage with SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP_PT077
Manual time planning fence was deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_PT076
Time planning fence was set to &1 &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_PT080
Activity from order &1 was firmed on resource &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_PT081
Activity from order &1 could not be firmed on resource &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.