How To Fix /SAPAPO/RRP_PT072 - Production planning: Changes only for backward scheduling


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/RRP_PT -

  • Message number: 072

  • Message text: Production planning: Changes only for backward scheduling

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RRP_PT072 - Production planning: Changes only for backward scheduling ?

    The SAP error message /SAPAPO/RRP_PT072 typically occurs in the context of production planning within the SAP Advanced Planning and Optimization (APO) module. This error indicates that changes can only be made for backward scheduling in the context of the planning process.

    Cause:

    The error message /SAPAPO/RRP_PT072 is triggered when:

    • You are trying to make changes to a production order or planning situation that is set up for backward scheduling, but the system detects that the changes you are attempting to make are not compatible with this scheduling method.
    • The system is configured to only allow certain types of changes when backward scheduling is in effect, which may include restrictions on changing dates, quantities, or other parameters.

    Solution:

    To resolve this error, consider the following steps:

    1. Check Scheduling Settings: Verify the scheduling settings for the production order or planning situation. Ensure that you are aware of the constraints imposed by backward scheduling.

    2. Adjust Changes: If you need to make changes, ensure that they are compatible with backward scheduling. This may involve:

      • Adjusting the planned start and finish dates to align with backward scheduling principles.
      • Ensuring that any changes to quantities or resources do not violate the constraints of backward scheduling.
    3. Switch to Forward Scheduling: If backward scheduling is not a strict requirement, consider switching to forward scheduling if it better suits your planning needs. This may involve changing the configuration in the planning settings.

    4. Consult Documentation: Review SAP documentation or help resources related to production planning and scheduling to understand the implications of backward scheduling and how to work within its constraints.

    5. Contact SAP Support: If the issue persists and you cannot find a resolution, consider reaching out to SAP support for assistance. They can provide insights specific to your system configuration and help troubleshoot the issue.

    Related Information:

    • Backward Scheduling: This is a method where the system calculates the start date of a production order based on the required finish date, working backward through the production process.
    • Forward Scheduling: In contrast, forward scheduling calculates the finish date based on the planned start date, moving forward through the production process.
    • Production Planning in SAP APO: Understanding the overall production planning process in SAP APO can help in troubleshooting and resolving scheduling-related issues.

    By following these steps and understanding the context of the error, you should be able to address the /SAPAPO/RRP_PT072 message effectively.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant