How To Fix /SAPAPO/RRP_PT039 - Choose either a line, a resource, or a planner


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/RRP_PT -

  • Message number: 039

  • Message text: Choose either a line, a resource, or a planner

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RRP_PT039 - Choose either a line, a resource, or a planner ?

    The SAP error message /SAPAPO/RRP_PT039 typically occurs in the context of SAP Advanced Planning and Optimization (APO) when a user attempts to perform an action that requires a specific selection (line, resource, or planner) but has not made a valid selection. This error is often encountered in the context of planning boards or interactive planning scenarios.

    Cause:

    The error message is triggered when:

    1. The user has not selected any line item, resource, or planner in the planning board or interactive planning screen.
    2. The selection criteria required for the action being performed are not met.
    3. There may be a configuration issue or a missing authorization that prevents the selection from being recognized.

    Solution:

    To resolve the error, you can take the following steps:

    1. Make a Valid Selection:

      • Ensure that you have selected at least one line item, resource, or planner before attempting to execute the action that triggered the error.
      • Check the planning board or interactive planning screen to confirm that your selection is highlighted.
    2. Check User Authorizations:

      • Verify that you have the necessary authorizations to perform the action you are attempting. If you lack the required permissions, contact your system administrator to obtain the necessary access.
    3. Review Configuration Settings:

      • If the issue persists, review the configuration settings in the APO system to ensure that the planning board or interactive planning setup is correctly configured.
      • Check if there are any specific settings related to the planner profiles or resource assignments that might be affecting your ability to make selections.
    4. Consult Documentation:

      • Refer to SAP documentation or help resources for additional context on the error message and any specific requirements for the action you are trying to perform.
    5. Contact Support:

      • If you are unable to resolve the issue through the above steps, consider reaching out to your SAP support team or consulting SAP Notes for any known issues related to this error message.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that might address this specific error or provide additional troubleshooting steps.
    • SAP Community: Engage with the SAP Community forums to see if other users have encountered similar issues and what solutions they have found.
    • Training and Documentation: Ensure that you are familiar with the functionalities of the planning board and the specific actions you are trying to perform, as this can help prevent similar errors in the future.

    By following these steps, you should be able to address the /SAPAPO/RRP_PT039 error and continue with your planning activities in SAP APO.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant