Message type: E = Error
Message class: /SAPAPO/RRP_HEUR -
Message number: 638
Message text: The heuristic cannot be executed for the planning horizon
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message /SAPAPO/RRP_HEUR638 indicates that the heuristic cannot be executed for the planning horizon specified. This error typically arises in the context of Advanced Planning and Optimization (APO) when trying to run a heuristic for production planning or scheduling. Causes: Planning Horizon Issues: The planning horizon defined in the system may not be set correctly. It could be too short or not aligned with the data available for planning. Data Availability: There may be insufficient or missing data for the planning period. This includes master data (like materials, resources, etc.) or transaction data (like demand, supply, etc.).
Configuration Issues: The heuristic may not be properly configured or activated in the system. Resource Constraints: There may be constraints on resources that prevent the heuristic from executing. Locking Issues: The planning area might be locked by another process, preventing the heuristic from running. Solutions: Check Planning Horizon: Review and adjust the planning horizon settings in the configuration. Ensure
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/RRP_HEUR637 No special sorting has been maintained for the sort criterion &1
What causes this issue? You have not maintained any special sorting for the sort criterion &V1&.System Response The sort criterion is not ta...
/SAPAPO/RRP_HEUR636 No fixed pegging relationships were deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_HEUR639 The PP plng procedure has not been defined for product &1 in location &2
What causes this issue? You have not defined the PP planning procedure for product &V1& in location &V2&.System Response This means ...
/SAPAPO/RRP_HEUR640 Planning version &1 could not be read
What causes this issue? The planning version &V1& could not be read.System Response This means that the method for determining the order pri...
Click on this link to search all SAP messages.