Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP_HEUR -
Message number: 613
Message text: The fixing horizon is zero days for product &1 in location &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_HEUR613
- The fixing horizon is zero days for product &1 in location &2 ?The SAP error message
/SAPAPO/RRP_HEUR613
indicates that the fixing horizon for a specific product at a given location is set to zero days. This means that the system does not have a defined period during which it can plan or fix the production or procurement of that product, which can lead to issues in planning and execution.Cause:
- Fixing Horizon Configuration: The fixing horizon is typically defined in the planning settings for the product in the SAP Advanced Planning and Optimization (APO) module. If it is set to zero, it means that there is no time frame for which the system can make commitments regarding production or procurement.
- Master Data Issues: The product master data or location master data may not be properly configured, leading to a lack of a defined fixing horizon.
- Planning Strategy: The planning strategy assigned to the product may not require a fixing horizon, or it may be incorrectly set up.
Solution:
Check and Update Fixing Horizon:
- Go to the product master data in the APO system.
- Navigate to the relevant planning view and check the fixing horizon settings.
- Update the fixing horizon to a positive value that makes sense for your planning needs.
Review Master Data:
- Ensure that the product and location master data are correctly configured.
- Check if the product is assigned to the correct planning area and that all necessary parameters are set.
Planning Strategy Review:
- Review the planning strategy assigned to the product. If it is not appropriate for the product's requirements, consider changing it to one that allows for a fixing horizon.
Consult Documentation:
- Refer to SAP documentation or help resources for detailed guidance on setting up the fixing horizon and related planning parameters.
Testing:
- After making changes, run the planning heuristic again to see if the error persists. Ensure that the changes have taken effect and that the planning runs as expected.
Related Information:
By addressing the fixing horizon and ensuring that all related master data and planning strategies are correctly configured, you should be able to resolve the error and proceed with your planning activities.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP_HEUR612
No fixing horizon has been defined for product &1 in location &2
What causes this issue? The <DS:DE./SAPAPO/RRP_FIXHZ>PP/DS fixing horizon</> has not been defined for product &V1& in location &a...
/SAPAPO/RRP_HEUR611
The ATP checking calendar is initial for product &1 in location &2
What causes this issue? The <DS:DE./SAPAPO/CHKHORCAL>ATP checking calendar</> is initial for product &V1& in location &V2&...
/SAPAPO/RRP_HEUR614
The number of days for the pegging horizon is zero
What causes this issue? The number of days you defined for the pegging horizon is zero.System Response This means that the heuristic cannot be execu...
/SAPAPO/RRP_HEUR615
No batch-managed reqmts that have not been pegged exist in selection
What causes this issue? No batch-managed requirements exist in the selection that have not yet been assigned using fixed pegging relationships.System...
Click on this link to search all SAP messages.