Message type: E = Error
Message class: /SAPAPO/RRP_HEUR -
Message number: 501
Message text: Order &1 is in the past and is not adjusted
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message /SAPAPO/RRP_HEUR501 Order &1 is in the past and is not adjusted typically occurs in the context of Advanced Planning and Optimization (APO) when the system encounters an order that is scheduled for a time in the past. This can happen during planning runs or when executing heuristics that attempt to adjust orders based on current planning parameters.
Cause: Order Date: The order in question has a start date or end date that is earlier than the current date. This means that the order is considered outdated and cannot be adjusted. Planning Horizon: The planning horizon set in the system may not include the past dates, leading to the exclusion of these orders from adjustments. Data Consistency: There may be inconsistencies in the data, such as incorrect order dates or missing updates in the planning book.
Solution: Check Order Dates: Review the order referenced in the error message to confirm its dates. If
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/RRP_HEUR500 Error when calculating time period outside the PP/DS horizon
What causes this issue? Due to an error, the heuristic was not able to calculate the period outside the <DS:GLOS.123C87C4AE4AD511AE750800062AFB0F&...
/SAPAPO/RRP_HEUR411 No products with make-to-stock production available
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_HEUR502 Order &1 is fixed and is not adjusted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_HEUR503 Error when reading the characteristics combinations
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.