Message type: E = Error
Message class: /SAPAPO/RRP_HEUR -
Message number: 214
Message text: An error occurred during the lot-size order
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_HEUR214
- An error occurred during the lot-size order ?The SAP error message /SAPAPO/RRP_HEUR214 typically indicates that there was an issue during the lot-sizing process in the Advanced Planning and Optimization (APO) module, specifically when trying to create or adjust orders based on lot size constraints. This error can arise due to various reasons, including configuration issues, data inconsistencies, or missing master data. Causes: Lot Size Configuration: The lot size settings in the material master or in the planning book may not be correctly configured. This includes fixed lot sizes, minimum or maximum lot sizes, or other constraints that are not being met. Master Data Issues: Missing or incorrect master data for the material, such as the material type, planning strategy, or lot size parameters. Planning Object Structure: The planning object structure may not be set up correctly, leading to issues when the heuristic tries to create orders. Capacity Constraints: If there are capacity constraints in the production or procurement process, the heuristic may
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/RRP_HEUR213
No production storage capacity is available for &1. Fill to reorder point
What causes this issue? The parameter of the heuristic was set to refill until the <ZH> <ZK>product storage capacity</></> is...
/SAPAPO/RRP_HEUR212
No reorder point exists for &1
What causes this issue? Planning for this product was stopped, because no <ZH><ZK>reorder point </></> could be determined.Sy...
/SAPAPO/RRP_HEUR215
Error occured in the lot-size calculation for product &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_HEUR216
Not all operations could be rescheduled
What causes this issue? The heuristic was not able to reschedule all the operations that you wanted to reschedule. An operation cannot be rescheduled...
Click on this link to search all SAP messages.