Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP_HEUR -
Message number: 181
Message text: An error occurred during the determination of the delivery date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_HEUR181
- An error occurred during the determination of the delivery date ?The SAP error message
/SAPAPO/RRP_HEUR181
indicates that there was an issue during the determination of the delivery date in the Advanced Planning and Optimization (APO) module, specifically in the context of the heuristic planning process. This error can arise due to various reasons, and understanding the cause is crucial for finding an appropriate solution.Possible Causes:
- Missing Master Data: The error may occur if there are missing or incomplete master data records, such as material master, location master, or resource master data.
- Incorrect Planning Parameters: If the planning parameters (like lead times, safety stock levels, etc.) are not set correctly, it can lead to issues in determining delivery dates.
- Capacity Constraints: If there are capacity constraints on resources or production lines, the system may not be able to determine a feasible delivery date.
- Scheduling Conflicts: Conflicts in scheduling, such as overlapping production orders or maintenance schedules, can prevent the system from calculating a delivery date.
- Configuration Issues: Incorrect configuration in the APO system, such as settings related to the heuristic or planning books, can lead to this error.
- Data Consistency Issues: Inconsistencies in the data, such as incorrect or outdated information in the database, can also trigger this error.
Solutions:
- Check Master Data: Ensure that all relevant master data (material, location, resource) is complete and accurate. Verify that all necessary fields are filled out correctly.
- Review Planning Parameters: Check the planning parameters in the APO system to ensure they are set correctly. Adjust lead times, safety stock levels, and other relevant parameters as needed.
- Analyze Capacity: Review the capacity of resources and production lines to ensure they can meet the demand. Adjust capacity settings or production schedules if necessary.
- Examine Scheduling: Look for any scheduling conflicts that may be affecting the delivery date determination. Resolve any overlapping orders or maintenance activities.
- Configuration Review: Check the configuration settings in the APO system, particularly those related to the heuristic being used. Ensure that they are set up correctly.
- Data Consistency Check: Run consistency checks on the data to identify and resolve any inconsistencies. This may involve checking for orphaned records or outdated information.
- Log Analysis: Review the logs generated during the planning run for any additional error messages or warnings that may provide more context about the issue.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to involve your SAP support team or consult with an SAP expert for further investigation.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP_HEUR180
Set a delivery date for &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_HEUR179
&1 dependent or stock transfer requirements are being rescheduled
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_HEUR182
Error determining the period
What causes this issue? You want to determine a period for the period type '&V1&'. If you use the period type 'K', the sy...
/SAPAPO/RRP_HEUR183
No requirements to be rescheduled for product &1 in location &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.