Message type: E = Error
Message class: /SAPAPO/RRP_HEUR -
Message number: 130
Message text: Reorder days' supply for product/location is not maintained
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_HEUR130
- Reorder days' supply for product/location is not maintained ?The SAP error message /SAPAPO/RRP_HEUR130 indicates that the reorder days' supply for a specific product/location combination is not maintained in the system. This error typically arises in the context of Advanced Planning and Optimization (APO) when trying to run heuristics or planning runs that require this information.
Cause: Missing Configuration: The reorder days' supply is not set up for the product/location in the APO system. Data Inconsistency: There may be inconsistencies in the master data, such as missing or incorrect entries in the product master or location master. Planning Area Settings: The planning area may not be configured correctly to include the necessary parameters for the product/location.
Solution: Maintain Reorder Days' Supply: Go to the product master data in APO (transaction /SAPAPO/MAT1 or similar). Navigate to the relevant product and location combination. Ensure that the "Reorder Days' Supply" field is filled in with a valid value. Check Master Data: Verify that the product and location master data is complete and accurate. Ensure
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/RRP_HEUR120
Period duration is longer than mid-term planning period
What causes this issue? The period lot size you have entered is larger than the length of the medium-term planning horizon.How can this happen? You ...
/SAPAPO/RRP_HEUR110
Period duration is longer than short-term planning period
What causes this issue? The period lot size you have entered is larger than the length of the short-term planning horizon. &example& You have...
/SAPAPO/RRP_HEUR135
Reorder days' supply is greater than the forwards pegging rel. at &1
What causes this issue? The <ZK><ZH>reorder days' supply</></> procedure was chosen and the dynamic pegging for <ZH&g...
/SAPAPO/RRP_HEUR136
Forward pegging relationship less than the period interval for &1
What causes this issue? The <ZH><ZK>periodic lot-sizing procedure</></> has been selected. The dynamic pegging for <ZH>...
Click on this link to search all SAP messages.