Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP_CDOC -
Message number: 028
Message text: Start date or end date is incorrect
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_CDOC028
- Start date or end date is incorrect ?The SAP error message
/SAPAPO/RRP_CDOC028
indicates that there is an issue with the start date or end date in the context of a planning or scheduling operation in SAP Advanced Planning and Optimization (APO). This error typically arises when the dates provided do not meet the expected criteria or constraints set within the system.Causes:
- Invalid Date Format: The date may not be in the correct format expected by the system.
- Date Range Issues: The start date may be after the end date, or the dates may fall outside of the allowed planning horizon.
- Calendar Settings: The dates may not align with the defined working days or calendar settings in the system.
- Master Data Issues: There may be issues with the master data (e.g., product, location) that affect the validity of the dates.
- Planning Version: The planning version being used may have restrictions or settings that invalidate the provided dates.
Solutions:
- Check Date Format: Ensure that the dates are entered in the correct format as required by the system.
- Validate Date Range: Confirm that the start date is before the end date and that both dates fall within the allowed planning horizon.
- Review Calendar Settings: Check the calendar settings in the system to ensure that the dates align with the defined working days.
- Examine Master Data: Verify that the relevant master data is correctly set up and does not have any inconsistencies that could affect date validity.
- Adjust Planning Version: If applicable, check the settings of the planning version being used and adjust the dates accordingly.
Related Information:
/SAPAPO/RRP3
(for planning board) or /SAPAPO/SDP94
(for demand planning) to analyze the planning data and identify issues.If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or refer to SAP community forums for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP_CDOC027
The order was not adjusted because of fixed lot size
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_CDOC026
More than two operations selected
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_CDOC029
Invalid resource type &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_CDOC030
Heuristic terminated due to an unexpected ASSERT
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.