Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP_CDOC -
Message number: 023
Message text: Both resources and operations have been selected
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_CDOC023
- Both resources and operations have been selected ?The SAP error message
/SAPAPO/RRP_CDOC023
indicates that both resources and operations have been selected in a planning scenario, which is not allowed. This error typically occurs in the context of Advanced Planning and Optimization (APO) when you are trying to execute a planning run or a similar operation that requires a specific selection of either resources or operations, but not both.Cause:
The error is caused by the selection criteria set in the planning run or transaction. When you select both resources and operations, the system cannot determine how to process the request, leading to this error message.
Solution:
To resolve this error, you need to ensure that you are only selecting either resources or operations, but not both. Here are the steps you can take:
Review Selection Criteria: Go back to the planning transaction or run where you encountered the error. Check the selection criteria you have set.
Modify Selection:
- If you need to plan at the resource level, deselect any operations that you have selected.
- Conversely, if you need to plan at the operation level, ensure that no resources are selected.
Re-run the Planning: After adjusting the selection criteria, re-run the planning process to see if the error persists.
Check Documentation: If you are unsure about the selection criteria, refer to the SAP documentation or help files related to the specific transaction you are using. This can provide guidance on how to properly set up your planning runs.
Consult with SAP Support: If the issue continues after making the necessary adjustments, consider reaching out to SAP support or your internal SAP team for further assistance.
Related Information:
/SAPAPO/RRP
for the interactive planning board.By following these steps, you should be able to resolve the error and proceed with your planning activities in SAP APO.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP_CDOC022
Neither resources nor operations have been selected
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_CDOC021
Select operation for backward/forward extension
What causes this issue? To extend an order (increase the order quantity) you selected a resource. This is not allowed.System Response The system iss...
/SAPAPO/RRP_CDOC024
More than one resource selected
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_CDOC025
Operations selected from more than one resource
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.