Message type: E = Error
Message class: /SAPAPO/RRP_CDOC -
Message number: 020
Message text: No operation start date/time
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_CDOC020
- No operation start date/time ?The SAP error message /SAPAPO/RRP_CDOC020 No operation start date/time typically occurs in the context of Advanced Planning and Optimization (APO) when there is an issue with the scheduling of operations in a production or planning scenario. This error indicates that the system cannot determine a start date or time for a specific operation, which is essential for scheduling and planning processes. Causes: Missing Data: The operation may not have a defined start date or time in the master data or in the planning scenario. Incorrect Configuration: The configuration settings for the production process or the planning strategy may not be set up correctly. Resource Availability: The resources required for the operation may not be available, leading to the inability to schedule the operation. Dependencies: There may be dependencies or constraints that prevent the operation from being scheduled, such as preceding operations not being completed. Planning Version Issues: The planning version being used may not have the
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/RRP_CDOC019
Segment interrupted by operation, downtime or fixing interval
What causes this issue? You have chosen a period in which there is not enough free capacity available Or you have chosen a period that lies completel...
/SAPAPO/RRP_CDOC018
Iteration limit of &1 has been reached
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_CDOC021
Select operation for backward/forward extension
What causes this issue? To extend an order (increase the order quantity) you selected a resource. This is not allowed.System Response The system iss...
/SAPAPO/RRP_CDOC022
Neither resources nor operations have been selected
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.