Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP_CDOC -
Message number: 001
Message text: CDOC heuristic &1 finished
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_CDOC001
- CDOC heuristic &1 finished ?The SAP error message
/SAPAPO/RRP_CDOC001
typically indicates that there was an issue with the execution of the CDOC (Capacity-Dependent Order Confirmation) heuristic in the SAP Advanced Planning and Optimization (APO) module. This heuristic is used for planning and scheduling in production environments.Cause:
The error message can arise due to several reasons, including:
- Data Issues: There may be missing or incorrect data in the master data (e.g., resources, production versions, or product master data) that the heuristic relies on.
- Configuration Problems: The settings for the heuristic might not be correctly configured, leading to issues during execution.
- Capacity Constraints: If the resources are overbooked or if there are capacity constraints that cannot be met, the heuristic may fail.
- Heuristic Parameters: Incorrect or suboptimal parameters set for the heuristic can lead to execution failures.
- System Performance: If the system is under heavy load or if there are performance issues, it may affect the execution of the heuristic.
Solution:
To resolve the error, you can take the following steps:
- Check Master Data: Ensure that all relevant master data is complete and accurate. This includes checking the resource definitions, production versions, and product master data.
- Review Heuristic Configuration: Verify the configuration settings for the CDOC heuristic. Ensure that the parameters are set correctly and that they align with your planning requirements.
- Analyze Capacity: Check the capacity of the resources involved. Make sure that there are no overbookings or capacity constraints that would prevent the heuristic from executing successfully.
- Run in Test Mode: If possible, run the heuristic in test mode to identify any specific issues or warnings that may not be apparent in the production run.
- Check Logs and Messages: Review the logs and messages generated during the heuristic run for any additional error messages or warnings that can provide more context on the failure.
- Consult Documentation: Refer to SAP documentation or notes related to the specific heuristic for any known issues or additional troubleshooting steps.
- Contact SAP Support: If the issue persists and you cannot identify the cause, consider reaching out to SAP support for assistance.
Related Information:
/SAPAPO/RRP3
to analyze the planning results and /SAPAPO/RRP4
for detailed planning board analysis.By following these steps, you should be able to diagnose and resolve the error related to the /SAPAPO/RRP_CDOC001
message.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP_CDOC000
&1 &2 &3 &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_BO032
The planning time fence was set to date &1 &2
What causes this issue? You have manually set the planning time fence to the date &v1& &v2&. The manually set planning time fence ove...
/SAPAPO/RRP_CDOC002
CDOC heuristic &1 terminated
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_CDOC003
No order generation &1
What causes this issue? Calling the heuristic did not deliver any results. The system has not created a new order, nor changed an existing one. This ...
Click on this link to search all SAP messages.