Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP_ATP -
Message number: 149
Message text: ****** CTP: PP/DS Bucket-Oriented Capacity Check *********
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_ATP149
- ****** CTP: PP/DS Bucket-Oriented Capacity Check ********* ?The SAP error message
/SAPAPO/RRP_ATP149
is related to the Capacity Check in the Advanced Planning and Optimization (APO) module, specifically in the context of the Capacity to Promise (CTP) functionality. This error typically indicates that there is an issue with the bucket-oriented capacity check during the planning process.Cause:
The error can arise due to several reasons, including:
- Capacity Constraints: The production resources (like machines or work centers) may not have enough capacity to fulfill the demand for the planned orders or sales orders.
- Incorrect Configuration: The configuration of the planning area or the resource may not be set up correctly, leading to discrepancies in capacity checks.
- Bucket Settings: The bucket settings in the planning book may not align with the requirements of the production process.
- Data Issues: There may be missing or incorrect master data (like resource availability, production versions, etc.) that affects the capacity check.
- Planning Horizon: The planning horizon may not be set correctly, leading to capacity checks being performed outside of the valid time frame.
Solution:
To resolve the error, you can take the following steps:
- Check Capacity Availability: Review the capacity of the relevant resources in the APO system. Ensure that the available capacity is sufficient to meet the demand.
- Review Resource Configuration: Verify the configuration of the resources in the APO system. Ensure that they are set up correctly with the right capacity and availability settings.
- Adjust Bucket Settings: If the bucket settings are incorrect, adjust them to ensure they align with the production requirements.
- Validate Master Data: Check the master data related to the resources, production versions, and any other relevant data to ensure it is complete and accurate.
- Planning Horizon Settings: Ensure that the planning horizon is set correctly in the system to avoid capacity checks being performed outside the valid time frame.
- Run Capacity Planning: After making the necessary adjustments, run the capacity planning process again to see if the issue is resolved.
Related Information:
/SAPAPO/RRP3
(Product View) or /SAPAPO/RRP4
(Order View) to analyze the planning situation and capacity issues.If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or refer to SAP community forums for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP_ATP109
Retry logic was executed &1 times for order &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_ATP108
ATP check cannot be carried out until changes have been saved
What causes this issue? The product view has been invoked from within another application. An ATP check can only be carried out when the changes made...
/SAPAPO/RRP_ATP150
The planning mode of strategy no. &1 of &2 is not suitable for CTP
What causes this issue? Strategy profile for CTP: The planning mode of the stategy number &V1& of the selected strategy profile &V2& ...
/SAPAPO/RRP_ATP151
The planning direction of strategy no. &1 of &2 is not suitable for CTP
What causes this issue? The planning direction in the strategy number &V1& of the selected strategy profile &V2& is not suitable for ...
Click on this link to search all SAP messages.