How To Fix /SAPAPO/RRP413 - Forecast &1: Date was changed


/SAPAPO/RRP413 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/RRP -

  • Message number: 413

  • Message text: Forecast &1: Date was changed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RRP413 - Forecast &1: Date was changed ?
    The SAP error message /SAPAPO/RRP413 Forecast &1: Date was changed typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there is a discrepancy between the forecast date and the planning data. This error indicates that the forecast date has been modified, which can lead to inconsistencies in the planning process.
    
    Cause: Date Change: The forecast date has been altered, which may not align with the existing planning data or other related forecasts. Data Consistency Issues: There may be inconsistencies in the data due to changes made in the master data, planning parameters, or forecast settings. Integration Issues: If the forecast is being integrated with other systems or modules, changes in one system may not be reflected in another, leading to discrepancies.
    Solution: Check Forecast Dates: Review the forecast dates in the system to ensure they are correct and consistent with the planning data. Revalidate Data: Ensure that all related master data and planning

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant