Message type: E = Error
Message class: /SAPAPO/RRP -
Message number: 380
Message text: Number of selected schedule lines: &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP380
- Number of selected schedule lines: &1 ?The SAP error message /SAPAPO/RRP380 with the text "Number of selected schedule lines: &1" typically occurs in the context of Advanced Planning and Optimization (APO) when there is an issue with the number of schedule lines selected for processing in the system. This error can arise during various planning activities, such as when trying to execute a planning run or when attempting to process a specific set of schedule lines in the system.
Cause: Exceeding Limits: The error often indicates that the number of selected schedule lines exceeds the system's predefined limits. This can happen if a user tries to process too many schedule lines at once. Configuration Settings: There may be configuration settings in the APO system that limit the number of schedule lines that can be processed simultaneously. Data Issues: There could be issues with the data itself, such as inconsistencies or missing information in the schedule lines that are being processed.
Solution: Reduce
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/RRP379
You do not have the authorization to change PP planning procedures
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP378
Pegging-relevant quantity remains the same; still execute conversion?
What causes this issue? For the PP planning procedure entered, the setting for the <DS:GLOS.7E707C18D72A7F4F8168C895211520A9>pegging-relevant&l...
/SAPAPO/RRP381
Planning proced. changed successfully; number of changed sched. lines: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP382
You have not specified a planning procedure
What causes this issue? You have not specified a <DS:GLOS.854DE7F79290D511BCC30800060D9C68>PP planning procedure</>.System Response INCL...
Click on this link to search all SAP messages.