How To Fix /SAPAPO/RRP311 - Pegging not considered; no forward scheduling


/SAPAPO/RRP311 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/RRP -

  • Message number: 311

  • Message text: Pegging not considered; no forward scheduling

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/RRP311 - Details

  • Error Code: /SAPAPO/RRP311

    Error Message: Pegging not considered; no forward scheduling


    Summary

    This error indicates that the system could not perform pegging and therefore did not execute forward scheduling during the planning run. Essentially, the system skipped linking supply and demand elements (pegging) and did not calculate future dates for planned orders or receipts.


    Root Causes

    • Pegging is not activated or incorrectly configured in the planning version or planning profile.
    • Master data issues such as missing or inconsistent pegging-relevant data (e.g., missing product relationships or incorrect location assignments).
    • Planning run parameters exclude pegging or forward scheduling (e.g., incorrect selection of planning horizon or planning mode).
    • System inconsistencies or missing integration between supply and demand elements preventing pegging logic from executing.


    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/RRP311 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author