Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP -
Message number: 210
Message text: Enter a scheduling status
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP210
- Enter a scheduling status ?The SAP error message
/SAPAPO/RRP210 Enter a scheduling status
typically occurs in the context of Advanced Planning and Optimization (APO) within SAP. This error indicates that a scheduling status is required for the operation you are trying to perform, but it has not been provided.Cause:
- Missing Scheduling Status: The most common cause of this error is that the user has not entered a scheduling status for the relevant planning object (like a production order, planned order, or a purchase order).
- Configuration Issues: There may be configuration settings in the APO system that require a scheduling status to be defined for certain operations.
- User Input Error: The user may have overlooked entering the scheduling status in the relevant field.
Solution:
- Enter Scheduling Status: When prompted with the error message, check the input fields and ensure that you have entered a valid scheduling status. This is typically done in the planning book or the relevant transaction where the error occurred.
- Check Configuration: If you are consistently encountering this error, it may be worth reviewing the configuration settings in the APO system to ensure that the scheduling status is set up correctly. This may involve checking the settings in the planning area or the relevant master data.
- User Training: Ensure that users are trained on the importance of entering a scheduling status and how to do it correctly in the system.
- Consult Documentation: Refer to SAP documentation or help resources for specific details on the scheduling status relevant to your planning scenario.
Related Information:
/SAPAPO/RRP3
for planning board).If the problem persists after trying the above solutions, it may be necessary to involve your SAP support team or consult with an SAP expert for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP209
Only reuse mode &2 is permissible for event &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP208
Action &2 is not permissible for event &1
What causes this issue? You have selected an invalid action for <DS:DE./SAPAPO/RRP_EVENT>event </> &V1&.System Response The syst...
/SAPAPO/RRP211
Enter the source location
What causes this issue? You have defined that only requirements or receipts of a particular source location are to be selected ('Location' ...
/SAPAPO/RRP212
Enter the target location
What causes this issue? You have defined that only requirements or receipts from a certain target location are to be selected (radio button 'Loc...
Click on this link to search all SAP messages.