Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP -
Message number: 153
Message text: No capacity load of transportation resource - from &1 to &2 product &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP153
- No capacity load of transportation resource - from &1 to &2 product &3 ?The SAP error message
/SAPAPO/RRP153
indicates that there is no capacity load available for a transportation resource when trying to transport a product from one location to another. This error typically arises in the context of Advanced Planning and Optimization (APO) within SAP, particularly in the Supply Chain Management (SCM) module.Cause:
- Capacity Constraints: The transportation resource (e.g., truck, ship) may not have enough capacity to handle the load of the specified product.
- Resource Configuration: The transportation resource may not be properly configured in the system, leading to a lack of available capacity.
- Planning Version: The planning version being used may not have the correct data or settings for the transportation resource.
- Time Period: The time period for which the transportation is being planned may not have any available capacity due to scheduling conflicts or other constraints.
- Product Availability: The product may not be available for transportation due to stock issues or other logistical constraints.
Solution:
- Check Resource Capacity: Review the capacity settings for the transportation resource in the system. Ensure that the resource has enough capacity to handle the load of the product.
- Adjust Planning Parameters: If necessary, adjust the planning parameters or settings for the transportation resource to ensure that it can accommodate the required load.
- Review Planning Version: Make sure that the correct planning version is being used and that it contains the necessary data for the transportation resource.
- Check Time Period: Verify that the time period for the transportation request is valid and that there are no scheduling conflicts.
- Product Availability Check: Ensure that the product is available for transportation and that there are no stock issues preventing its movement.
- Consult Documentation: Refer to SAP documentation or help resources for additional guidance on configuring transportation resources and resolving capacity issues.
Related Information:
/SAPAPO/SDP94
(for planning board) or /SAPAPO/CTM
(for the Capable-to-Match planning) to analyze the situation further.By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP152
No goods receipt processing time for order for product &1, loc &2
What causes this issue? A goods receipt processing time and/or goods issue processing time is defined in the Product Master for the procured product....
/SAPAPO/RRP151
No capacity load of the handling resource for product &1, loc &2
What causes this issue? In the Product Master, a capacity consumption has been defined for the handling resource. A handling resource has also been s...
/SAPAPO/RRP154
No transportation duration in order for transp. lane &1 product &2 &3
What causes this issue? A transportation duration has been defined in the transportation lane <(>&<)>v1& for product <(>&am...
/SAPAPO/RRP155
Subcontractor product &1 in location &2 does not exist
What causes this issue? The product &v1& is procured via subcontracting. The system attempts to plan the product &v1& in the supplyin...
Click on this link to search all SAP messages.