How To Fix /SAPAPO/RRP102 - With durations > 0 , the start date has to be entered too


/SAPAPO/RRP102 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/RRP -

  • Message number: 102

  • Message text: With durations > 0 , the start date has to be entered too

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RRP102 - With durations > 0 , the start date has to be entered too ?
    The SAP error message /SAPAPO/RRP102 typically occurs in the context of Advanced Planning and Optimization (APO) when you are trying to create or modify a planning object (like a production order, planned order, or a similar entity) that has a duration greater than zero. The error indicates that if you have specified a duration for the activity, you must also provide a start date.
    
    Cause: The error arises because the system requires both a start date and a duration to calculate the end date of the activity. If only the duration is provided without a corresponding start date, the system cannot determine when the activity is supposed to begin, leading to this error.
    Solution: To resolve this error, you need to ensure that both the start date and the duration are specified when creating or modifying the planning object. Here are the steps you can take: Check Input Fields: Ensure that you have filled in

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author