How To Fix /SAPAPO/RET_MESSAGES592 - Planning version &1 cannot be locked due to locked production volumes


/SAPAPO/RET_MESSAGES592 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/RET_MESSAGES -

  • Message number: 592

  • Message text: Planning version &1 cannot be locked due to locked production volumes

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RET_MESSAGES592 - Planning version &1 cannot be locked due to locked production volumes ?
    The SAP error message /SAPAPO/RET_MESSAGES592 indicates that a planning version in SAP Advanced Planning and Optimization (APO) cannot be locked because there are locked production volumes associated with that version. This typically occurs when there are ongoing processes or transactions that are preventing the system from locking the planning version for updates or changes.
    
    Cause: Locked Production Volumes: The primary cause of this error is that there are production volumes that are currently locked. This can happen if: A user or process is currently working with the production volumes. There are background jobs or processes that are accessing or modifying the production volumes. The production volumes are being used in a planning run or other operations. Concurrency Issues: Multiple users or processes trying to access the same planning version simultaneously can lead to locking issues.
    Solution: To resolve this error, you can take the following steps: Identify Locked Objects: Use transaction code SM12 to check for locked entries in the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant