Message type: E = Error
Message class: /SAPAPO/RET_MESSAGES -
Message number: 153
Message text: Start date must be a workday
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RET_MESSAGES153
- Start date must be a workday ?The SAP error message
/SAPAPO/RET_MESSAGES153
indicates that the start date you are trying to use in a planning or scheduling operation is not a workday. This error typically occurs in the context of Advanced Planning and Optimization (APO) when you are trying to create or modify a planning object, such as a production order, a transportation order, or a forecast.Cause:
- Non-Workday Selection: The date you have selected as the start date falls on a weekend or a holiday that is not considered a workday in the system.
- Calendar Settings: The factory calendar or the planning calendar configured in the system may not include the selected date as a valid workday.
- Configuration Issues: There may be issues with how the workdays are defined in the system, leading to incorrect identification of workdays.
Solution:
- Select a Valid Workday: Change the start date to a date that is confirmed as a workday. You can check the calendar settings in the system to identify valid workdays.
- Check Factory Calendar: Review the factory calendar settings in the SAP system to ensure that the correct workdays and holidays are defined. You can do this by navigating to:
- Transaction Code:
SCAL
(for maintaining calendars)- Transaction Code:
OVX5
(for checking factory calendar settings)- Adjust Planning Parameters: If necessary, adjust the planning parameters or settings to ensure that the system recognizes the intended workdays correctly.
- Consult with SAP Basis or Configuration Team: If you are unsure about the calendar settings or if the issue persists, consult with your SAP Basis or configuration team to ensure that the system is set up correctly.
Related Information:
SCAL
for calendar maintenance and MD01
for running planning.By following these steps, you should be able to resolve the error and proceed with your planning activities in SAP APO.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RET_MESSAGES152
This field is not used in reservation planning
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RET_MESSAGES151
The maximum block size must not be one
What causes this issue? You can only enter values greater than 1 when using the block restriction.System Response The system issues an error message...
/SAPAPO/RET_MESSAGES154
End date has been adjusted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RET_MESSAGES155
Enter valid start shift
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.