How To Fix /SAPAPO/RET_MESSAGES008 - Start date was set to earliest calendar date


/SAPAPO/RET_MESSAGES008 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/RET_MESSAGES -

  • Message number: 008

  • Message text: Start date was set to earliest calendar date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RET_MESSAGES008 - Start date was set to earliest calendar date ?
    The SAP error message /SAPAPO/RET_MESSAGES008 indicates that the start date for a certain operation or process has been set to the earliest calendar date, which is typically January 1, 1970. This can occur in various scenarios within SAP Advanced Planning and Optimization (APO) when the system is unable to determine a valid start date for a planning operation.
    
    Cause: Invalid Date Configuration: The start date may have been set incorrectly in the planning parameters or master data. Missing Data: Required data for the planning process (like product availability, demand, or supply) may be missing or not properly configured. System Defaults: The system may default to the earliest date if no valid date is provided or if the date is outside the acceptable range. Data Transfer Issues: If data is being transferred from another system (like SAP ERP), there may be issues with the data mapping or transfer process.
    Solution: Check Planning Parameters: Review the planning parameters and

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker