How To Fix /SAPAPO/RES_MSG039 - Resource network &1 is being used in orders. Please refer the long text.


/SAPAPO/RES_MSG039 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/RES_MSG -

  • Message number: 039

  • Message text: Resource network &1 is being used in orders. Please refer the long text.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RES_MSG039 - Resource network &1 is being used in orders. Please refer the long text. ?
    The SAP error message /SAPAPO/RES_MSG039 indicates that a resource network (identified by &1) is currently being utilized in orders, which prevents certain operations from being performed on that resource. This error typically arises in the context of Advanced Planning and Optimization (APO) when trying to modify or delete a resource that is actively being used in production orders, planned orders, or other scheduling activities.
    
    Cause: Active Orders: The resource network is linked to one or more active production or planned orders. Resource Locking: The system locks resources that are in use to prevent inconsistencies during planning and execution. Dependencies: There may be dependencies or constraints in the planning process that require the resource to remain allocated to the existing orders.
    Solution: To resolve this error, you can take the following steps: Check Active Orders: Use transaction codes like CO03 (Display Production Order) or MD04 (Stock/Requirements List) to identify any active orders that are using the resource network. Review the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant