Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PUSH -
Message number: 007
Message text: Lot-size range in prod. master does not match that of source of supply
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PUSH007
- Lot-size range in prod. master does not match that of source of supply ?The SAP error message
/SAPAPO/PUSH007
indicates that there is a mismatch between the lot size range defined in the production master data and the lot size range of the source of supply in the Advanced Planning and Optimization (APO) module. This error typically arises during the planning process when the system attempts to create a production order or a planned order but finds that the lot size constraints do not align.Cause:
- Lot Size Configuration: The production master data (e.g., production version or product master) has a defined lot size range that does not match the lot size range of the source of supply (e.g., vendor or production plant).
- Source of Supply Settings: The source of supply (like a vendor or a production plant) may have its own lot size settings that are incompatible with the production master data.
- Planning Parameters: The planning parameters set in the APO system may not be aligned with the lot size settings in the production master data.
Solution:
Check Production Master Data:
- Go to the production master data (transaction code
C223
for production versions orC201
for production orders) and verify the lot size range settings.- Ensure that the minimum and maximum lot sizes are correctly defined.
Check Source of Supply:
- Review the source of supply settings (transaction code
ME11
for vendor master orMD03
for planning) and ensure that the lot size range is compatible with the production master data.- Adjust the lot size settings in the source of supply if necessary.
Align Lot Size Settings:
- If there are discrepancies, align the lot size settings between the production master data and the source of supply.
- Ensure that the lot size range in the production master data allows for the quantities that can be supplied by the source of supply.
Review Planning Parameters:
- Check the planning parameters in the APO system to ensure they are set correctly and are compatible with the lot size settings.
Consult Documentation:
- Refer to SAP documentation or help resources for detailed guidance on configuring lot sizes in both production and supply chain settings.
Related Information:
C223
: Production VersionC201
: Production OrderME11
: Vendor MasterMD03
: PlanningBy following these steps, you should be able to resolve the /SAPAPO/PUSH007
error and ensure that your lot size settings are correctly aligned for effective production planning.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PUSH006
Error occurred while creating order
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PUSH005
Lot size adjusted to lot-size range of the product master
What causes this issue? In the product master, a valid lot-size range is defined for the leading material of the production process model selected. T...
/SAPAPO/PUSH008
Lot size adjusted to lot-size range of the source of supply
What causes this issue? A valid lot-size range is defined in the source of supply. The quantity desired lies outside this lot-size range.System Respo...
/SAPAPO/PUSH009
Choose a row from the planning pool first
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.