Message text: Shipping date &1 is in the past (schedule line &2)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PUIA_MESS234
- Shipping date &1 is in the past (schedule line &2) ?The SAP error message
/SAPAPO/PUIA_MESS234
indicates that the shipping date specified for a schedule line is in the past. This error typically occurs in the context of Advanced Planning and Optimization (APO) when trying to process or confirm a delivery or shipment that has a shipping date that is earlier than the current date.Cause:
- Incorrect Date Entry: The shipping date may have been entered incorrectly, either manually or through a system process.
- Delayed Processing: The order or delivery might have been created or scheduled for a date that has already passed due to delays in processing.
- System Configuration: There may be settings in the system that do not allow for past dates to be used in shipping schedules.
- Data Migration Issues: If data was migrated from another system, it’s possible that the shipping dates were not updated correctly.
Solution:
- Check and Update Shipping Date: Review the shipping date for the schedule line in question. If it is indeed in the past, update it to a valid future date.
- Review Order Processing: Ensure that the order or delivery is being processed in a timely manner to avoid scheduling issues.
- System Configuration Review: Check the configuration settings in SAP APO to ensure that they allow for the correct handling of shipping dates.
- Consult with IT or SAP Support: If the issue persists, it may be necessary to consult with your IT department or SAP support for further investigation into the system settings or potential bugs.
Related Information:
/SAPAPO/SDP94
(for viewing and managing shipping schedules) or /SAPAPO/SDP93
(for checking the details of the schedule lines).By addressing the root cause of the error and ensuring that the shipping dates are correctly set, you should be able to resolve the issue effectively.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PUIA_MESS233
Scheduling for schedule line &1 automatically executed
What causes this issue? You have changed the delivery or shipping date/time so that a rescheduling is necessary. The system issues an error message a...
/SAPAPO/PUIA_MESS232
Delivery date &1 is in the past (schedule line &2)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PUIA_MESS235
Check procurement duration of schedule line &1 (rescheduling if nec.)
What causes this issue? The current length of procurement of &V2& days differs from the length of procurement of &V3& days that would...