How To Fix /SAPAPO/PRP026 - Maintain at least 2 material values


/SAPAPO/PRP026 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/PRP -

  • Message number: 026

  • Message text: Maintain at least 2 material values

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PRP026 - Maintain at least 2 material values ?
    The SAP error message /SAPAPO/PRP026 Maintain at least 2 material values typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when working with planning books or data views that require multiple material values for effective planning.
    
    Cause: This error message indicates that the planning book or data view you are trying to use requires at least two material values to perform the necessary calculations or analyses. The absence of sufficient material values can hinder the planning process, as the system expects to have a comparative basis for analysis.
    Solution: To resolve this error, you can take the following steps: Check the Planning Book Configuration: Ensure that the planning book you are using is configured to include at least two material values. You may need to adjust the settings in the planning book to include additional materials. Add Material Values: If you are working with a specific planning view, make sure to add at least

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker