Message type: E = Error
Message class: /SAPAPO/PROD -
Message number: 806
Message text: Percentage yield must lie between 0 and 100
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message /SAPAPO/PROD806 indicates that there is an issue with the percentage yield value in the context of production planning or process orders in SAP Advanced Planning and Optimization (APO). Specifically, the error states that the percentage yield must lie between 0 and 100, meaning that the value entered is either negative or exceeds 100%.
Cause: Invalid Input: The percentage yield value entered in the system is outside the acceptable range (less than 0% or greater than 100%). Data Entry Error: There may have been a typographical error during data entry.
Configuration Issues: The configuration settings for the production process may not be set correctly, leading to incorrect yield values being calculated or entered. Master Data Issues: The master data for the material or production process may have incorrect yield values defined.
Solution: Check Input Values: Review the percentage yield value entered in the relevant transaction or master data. Ensure that it is a valid
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/PROD805 Enter a "valid-to" date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PROD804 Required entry not made
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PROD807 Unit of measure has changed from & to & (Check values)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PROD808 Time-dependent overriding of a(n) & not allowed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.