Message type: E = Error
Message class: /SAPAPO/PROD -
Message number: 523
Message text: Chained PP/DS plan does not exist
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message /SAPAPO/PROD523 Chained PP/DS plan does not exist typically occurs in the context of SAP Advanced Planning and Optimization (APO), specifically within the Production Planning and Detailed Scheduling (PP/DS) module. This error indicates that the system is unable to find a linked or chained planning version or plan that is required for the operation you are trying to perform.
Cause: Missing Planning Version: The specific PP/DS plan that is expected to be linked or chained does not exist in the system. Incorrect Configuration: The configuration settings for the planning process may not be set up correctly, leading to the system not being able to find the required plan. Data Migration Issues: If data has been migrated from another system or version, the necessary plans may not have been transferred correctly. Authorization Issues: The user may not have the necessary authorizations to access the required PP/DS plan.
Solution: Check Planning Versions: Verify that the required
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/PROD522 Primary resource (MODE) was not entered in table REQCAP
What causes this issue? The following entry in the table MODE contains a primary resource that has not been maintained in the resource table REQCAP. ...
/SAPAPO/PROD521 Routing for successor activity does not exist
What causes this issue? The table ACTREL contains a successor activity, the plan number of which has not yet been created in the routing table PLAN. ...
/SAPAPO/PROD524 Assigned cost profile does not exist
What causes this issue? The cost profile assigned does not exist. The system issues an error message and will not allow you to continue with this tra...
/SAPAPO/PROD525 Plan &1 not activated due to missing bucket consumptions
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Sys...
Click on this link to search all SAP messages.