Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PROD -
Message number: 089
Message text: Planning object for peg ID &1 not found
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PROD089
- Planning object for peg ID &1 not found ?The SAP error message
/SAPAPO/PROD089
indicates that a planning object for a specific peg ID could not be found in the system. This error typically occurs in the context of Advanced Planning and Optimization (APO) when the system is trying to access or manipulate a planning object that does not exist or is not available in the database.Causes:
- Non-existent Peg ID: The peg ID referenced in the error message does not exist in the system. This could be due to a typo or an incorrect reference.
- Data Deletion: The planning object associated with the peg ID may have been deleted or archived, making it unavailable for the current planning run.
- Incorrect Configuration: There may be configuration issues in the APO system that prevent the system from recognizing the peg ID.
- Master Data Issues: Missing or incomplete master data related to the planning object can lead to this error.
- Transport Issues: If the system has recently undergone a transport of changes, the planning object may not have been transported correctly.
Solutions:
- Verify Peg ID: Check the peg ID in the error message for accuracy. Ensure that it is correctly referenced in your planning process.
- Check Data Availability: Use transaction codes like
/SAPAPO/PEGID
or relevant reports to check if the peg ID exists in the system. If it does not, you may need to recreate it or adjust your planning parameters.- Review Master Data: Ensure that all necessary master data (like product, location, etc.) is correctly set up and available in the system.
- Check for Deletions: Investigate if the planning object has been deleted or archived. If so, you may need to restore it or adjust your planning strategy.
- Configuration Review: Review the configuration settings in the APO system to ensure that everything is set up correctly for the planning process.
- Consult Logs: Check the application logs for any additional error messages or warnings that might provide more context about the issue.
- Contact Support: If the issue persists, consider reaching out to SAP support or your internal SAP team for further assistance.
Related Information:
/SAPAPO/PEGID
, /SAPAPO/OM
, and others that may help in troubleshooting.By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PROD088
Mode &1 with resource load &2: Both have variable consumption
What causes this issue? A resource consumption has been maintained in the PPM as variable according to order quantity. The duration of the mode to wh...
/SAPAPO/PROD087
Operation &1, activity &2, mode &3, calendar resource &4, not used
What causes this issue? This resource is not assigned to the selected model (which belongs to the current planning version).System Response This res...
/SAPAPO/PROD090
Planning data for PPM &1 is inconsistent
What causes this issue? No material consumption could be determined for the main product in the plan. It is possible that the consumption values for ...
/SAPAPO/PROD091
Primary resource not maintained
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.