Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PROD -
Message number: 086
Message text: Operation &1, activity &2, mode &3, calendar resource &4, not created
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PROD086
- Operation &1, activity &2, mode &3, calendar resource &4, not created ?The SAP error message
/SAPAPO/PROD086
typically indicates that there is an issue with the creation of a production order or a related operation in the Advanced Planning and Optimization (APO) module. The message provides specific details about the operation, activity, mode, and calendar resource that could not be created.Cause:
The error can be caused by several factors, including:
Resource Availability: The specified resource (calendar resource) may not be available for the operation due to scheduling conflicts or unavailability during the planned time.
Incorrect Configuration: The configuration of the production process, including the operation, activity, or mode, may not be set up correctly in the system.
Capacity Constraints: There may be capacity constraints that prevent the operation from being scheduled on the specified resource.
Missing Master Data: Required master data (like resource, production version, or routing) may be missing or incorrectly maintained.
Calendar Issues: The calendar associated with the resource may not be defined correctly, or it may not have the necessary working days or shifts defined.
Solution:
To resolve the error, you can take the following steps:
Check Resource Availability: Verify that the resource is available for the specified time period. You can do this by checking the resource's calendar and ensuring that it has the necessary capacity.
Review Configuration: Ensure that the operation, activity, and mode are correctly configured in the system. Check the routing and production version to ensure they are set up correctly.
Adjust Capacity: If there are capacity constraints, consider adjusting the capacity of the resource or rescheduling the operation to a time when the resource is available.
Verify Master Data: Check that all necessary master data is correctly maintained. This includes ensuring that the resource, production version, and routing are all correctly defined.
Check Calendar Settings: Review the calendar settings for the resource to ensure that it has the correct working days and shifts defined.
Consult Logs: Look at the application logs or system logs for more detailed error messages that may provide additional context for the issue.
Related Information:
/SAPAPO/RES01
(Resource Overview) or /SAPAPO/PROD01
(Production Planning) to investigate resources and production orders.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PROD085
Internal error &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PROD084
Enter a text for the operation &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PROD087
Operation &1, activity &2, mode &3, calendar resource &4, not used
What causes this issue? This resource is not assigned to the selected model (which belongs to the current planning version).System Response This res...
/SAPAPO/PROD088
Mode &1 with resource load &2: Both have variable consumption
What causes this issue? A resource consumption has been maintained in the PPM as variable according to order quantity. The duration of the mode to wh...