How To Fix /SAPAPO/PPO_OPT088 - Planning dates have been changed in the BAdI implementation


/SAPAPO/PPO_OPT088 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/PPO_OPT -

  • Message number: 088

  • Message text: Planning dates have been changed in the BAdI implementation

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PPO_OPT088 - Planning dates have been changed in the BAdI implementation ?
    The SAP error message /SAPAPO/PPO_OPT088 indicates that there is an issue related to planning dates being changed in a BAdI (Business Add-In) implementation within the SAP Advanced Planning and Optimization (APO) module. This error typically arises when the planning dates for a particular operation or process have been modified in a way that is not compatible with the expected behavior of the system.
    
    Cause: BAdI Implementation: The error is often caused by a custom implementation of a BAdI that alters the planning dates. This could be due to logic that changes the dates in a way that conflicts with the standard processing rules of SAP APO. Data Inconsistency: There may be inconsistencies in the data being processed, such as incorrect or unexpected values for planning dates.
    Configuration Issues: Incorrect configuration settings in the APO system can also lead to this error, especially if the settings do not align with the logic defined in the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant