Message type: E = Error
Message class: /SAPAPO/PPO_OPT -
Message number: 025
Message text: Step 1: Data read and model creation started at &1 on &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PPO_OPT025
- Step 1: Data read and model creation started at &1 on &2 ?The SAP error message /SAPAPO/PPO_OPT025 typically indicates an issue during the optimization process in SAP Advanced Planning and Optimization (APO). This message is part of the optimization framework and is related to the data reading and model creation phase of the optimization run.
Cause: Data Issues: The error may arise due to missing or inconsistent data in the master data or transaction data that the optimization process relies on. Configuration Problems: Incorrect configuration settings in the APO system can lead to issues during the optimization process. Resource Constraints: Insufficient system resources (like memory or processing power) can cause the optimization process to fail. Locking Issues: If the data being accessed is locked by another process, it can lead to this error. Versioning Issues: If there are multiple versions of the planning model, it may cause conflicts during the optimization run.
Solution: Check Data Consistency: Ensure that all necessary master data (like materials, resources, and locations) and transaction data
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/PPO_OPT024
Error setting up connection to application server
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PPO_OPT023
Error during upload to application server
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PPO_OPT026
Optimization-based planning completed at &1 on &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PPO_OPT027
Total number of products: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.