How To Fix /SAPAPO/PPO_OPT016 - The number of parallel processes must be greater than 0.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/PPO_OPT -

  • Message number: 016

  • Message text: The number of parallel processes must be greater than 0.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PPO_OPT016 - The number of parallel processes must be greater than 0. ?

    The SAP error message /SAPAPO/PPO_OPT016 indicates that the number of parallel processes configured for a specific operation in SAP Advanced Planning and Optimization (APO) must be greater than zero. This error typically arises when you are trying to execute a planning run or optimization process that requires parallel processing, but the system is configured with zero parallel processes.

    Cause:

    1. Configuration Issue: The number of parallel processes for the planning run or optimization job has been set to zero in the configuration settings.
    2. Job Scheduling: The job that is supposed to run in parallel may not have been properly scheduled or configured.
    3. System Parameters: The system parameters related to parallel processing may not be set correctly.

    Solution:

    To resolve this error, you can follow these steps:

    1. Check Configuration Settings:

      • Go to the transaction code /SAPAPO/OPT1 (or the relevant configuration transaction for your APO system).
      • Look for the settings related to parallel processing.
      • Ensure that the number of parallel processes is set to a value greater than zero.
    2. Adjust Job Scheduling:

      • If you are using background jobs, check the job scheduling settings in transaction SM37 (Job Monitoring).
      • Ensure that the job is configured to allow for parallel processing.
    3. Review System Parameters:

      • Check the system parameters related to parallel processing in transaction RZ10 or RZ11.
      • Make sure that any relevant parameters (like rdisp/wp_no_dia) are set correctly to allow for parallel processing.
    4. Test the Configuration:

      • After making changes, run a test planning run or optimization job to ensure that the error does not occur again.
    5. Consult Documentation:

      • Refer to SAP documentation or notes related to your specific version of APO for any additional configuration steps or considerations.
    6. Contact SAP Support:

      • If the issue persists after checking the above settings, consider reaching out to SAP support for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as /SAPAPO/OPT1 for configuration, SM37 for job monitoring, and RZ10/RZ11 for system parameters.
    • SAP Notes: Check for any SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • Documentation: Review the SAP APO documentation for best practices on configuring parallel processing and optimization jobs.

    By following these steps, you should be able to resolve the error and successfully execute your planning or optimization processes in SAP APO.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author