How To Fix /SAPAPO/PPM_MAINTAIN860 - No linked PP/DS plan exists for SNP plan &1


/SAPAPO/PPM_MAINTAIN860 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/PPM_MAINTAIN -

  • Message number: 860

  • Message text: No linked PP/DS plan exists for SNP plan &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PPM_MAINTAIN860 - No linked PP/DS plan exists for SNP plan &1 ?
    The SAP error message /SAPAPO/PPM_MAINTAIN860 indicates that there is no linked Production Planning/Detailed Scheduling (PP/DS) plan associated with the Supply Network Planning (SNP) plan specified in the error message. This can occur in the Advanced Planning and Optimization (APO) module of SAP when trying to perform operations that require a connection between SNP and PP/DS.
    
    Cause: Missing Link: The most common cause is that the SNP plan you are trying to use does not have a corresponding PP/DS plan linked to it.
    Configuration Issues: There may be configuration issues in the planning area or the planning book that prevent the linking of the plans. Data Inconsistencies: There could be inconsistencies in the master data or planning data that prevent the system from recognizing the link. Incorrect Settings: The settings in the planning area or the planning book may not be correctly defined to allow for the linking of SNP and PP/DS plans.
    Solution: Check Plan Linkage: Go to

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant