How To Fix /SAPAPO/PPM_MAINTAIN599 - PPM check ended without errors


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/PPM_MAINTAIN -

  • Message number: 599

  • Message text: PPM check ended without errors

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PPM_MAINTAIN599 - PPM check ended without errors ?

    The SAP error message /SAPAPO/PPM_MAINTAIN599 typically indicates that a check related to the Production Planning and Detailed Scheduling (PP/DS) or the Production Planning Module (PPM) has been executed, and it has ended without any errors. This message is generally informational rather than an error, suggesting that the checks performed on the Production Planning Model (PPM) have been completed successfully.

    Cause:

    1. Successful Execution: The message indicates that the checks for the PPM have been executed successfully without any issues.
    2. No Data Issues: It implies that there are no inconsistencies or errors in the data related to the PPM that was checked.

    Solution:

    Since this message indicates a successful check, there is typically no action required. However, if you are expecting to see errors or warnings and are not, consider the following:

    1. Review the Check Parameters: Ensure that the parameters for the check were set correctly. If you were expecting specific checks to be performed, verify that they were included in the execution.
    2. Check Logs: Review the logs or output of the check to confirm what was checked and ensure that all relevant aspects were covered.
    3. Documentation: Refer to SAP documentation or help resources for further clarification on the checks performed and their implications.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes in SAP APO (Advanced Planning and Optimization) that relate to PPM and PP/DS, such as /SAPAPO/PPM for maintaining PPM.
    • SAP Notes: Check for any SAP Notes related to PPM checks or the specific message number for additional context or updates.
    • SAP Community: Engage with the SAP Community forums for insights from other users who may have encountered similar messages.

    In summary, the message /SAPAPO/PPM_MAINTAIN599 indicates a successful check, and no immediate action is required unless you are looking for specific issues that were not flagged.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant