Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PPM_MAINTAIN -
Message number: 550
Message text: Variable bucket consumption of resource &1 &2 &3 &4 less than 0.001
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PPM_MAINTAIN550
- Variable bucket consumption of resource &1 &2 &3 &4 less than 0.001 ?The SAP error message
/SAPAPO/PPM_MAINTAIN550
indicates that there is an issue with the variable bucket consumption of a resource in the Advanced Planning and Optimization (APO) module. Specifically, the message states that the consumption of the resource is less than 0.001, which is likely causing problems in the planning process.Cause:
- Resource Configuration: The resource may not be configured correctly, leading to very low or negligible consumption values.
- Planning Parameters: The planning parameters for the resource might be set in a way that results in minimal consumption.
- Data Issues: There could be issues with the data being used for planning, such as incorrect demand or supply data.
- Bucket Size: The bucket size for the planning horizon may be too large, causing the consumption to appear negligible.
- Resource Availability: The resource may not be available for the planned period, leading to zero or near-zero consumption.
Solution:
- Check Resource Configuration: Review the configuration of the resource in the APO system. Ensure that it is set up correctly and that all relevant parameters are defined.
- Review Planning Parameters: Look into the planning parameters associated with the resource. Adjust them if necessary to ensure that they reflect realistic consumption values.
- Validate Data: Check the demand and supply data being used in the planning process. Ensure that there are no discrepancies or errors in the data.
- Adjust Bucket Size: If the bucket size is too large, consider adjusting it to a smaller size to get a more accurate representation of consumption.
- Resource Availability Check: Ensure that the resource is available for the planned period. If it is not, consider adjusting the planning to reflect the actual availability.
Related Information:
/SAPAPO/PPM
to access the planning board and review the resource settings.By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PPM_MAINTAIN549
Variable continuous consumption of resource &1 &2 &3 &4 less than 0.001
What causes this issue? The value of the variable continuous consumption of the specified resource is less than 0.001 if the minimum lot size of the ...
/SAPAPO/PPM_MAINTAIN548
Campaign-relevant resource &1 &2 &3 &4 must not be secondary resource
What causes this issue? You have used a <DS:DE./SAPAPO/CRES_CAMPAIGN_PPDS>Campaign-Relevant Resource</> as a <DS:GLOS.3526C53AAFAB52B9...
/SAPAPO/PPM_MAINTAIN551
Primary resources have different consumptions within operation &1
What causes this issue? Within the operation &V1& the modes are coupled with the activities via primary resources. A prerequisite for this is...
/SAPAPO/PPM_MAINTAIN552
No synchr. in case of overlapping may be set for secondary resource &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.