Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PPM_MAINTAIN -
Message number: 547
Message text: Error choosing primary resource within activity &1 &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PPM_MAINTAIN547
- Error choosing primary resource within activity &1 &2 ?The SAP error message
/SAPAPO/PPM_MAINTAIN547
typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with Production Planning and detailed scheduling. This error indicates that there is an issue with selecting a primary resource for a specific activity in a production plan.Cause of the Error
The error can be caused by several factors, including:
- Resource Availability: The primary resource required for the activity may not be available or may be fully booked during the required time frame.
- Resource Configuration: The resource may not be properly configured in the system, or it may not be assigned to the relevant production process.
- Capacity Constraints: There may be capacity constraints that prevent the system from assigning the resource to the activity.
- Incorrect Activity Settings: The settings for the activity may not align with the available resources, leading to a failure in resource selection.
- Master Data Issues: There may be issues with the master data related to the resources, such as incorrect or missing information.
Solution
To resolve the error, you can take the following steps:
Check Resource Availability:
- Verify the availability of the primary resource for the required time period. You can do this by checking the resource's capacity and scheduling information.
Review Resource Configuration:
- Ensure that the resource is correctly configured in the system. Check the resource master data to confirm that it is set up for the relevant production process.
Adjust Capacity Settings:
- If there are capacity constraints, consider adjusting the capacity settings for the resource or re-evaluating the scheduling of the activity.
Validate Activity Settings:
- Review the settings for the activity to ensure they are compatible with the available resources. Make any necessary adjustments to align the activity with the resource capabilities.
Check Master Data:
- Ensure that all relevant master data (e.g., resource master, production version, etc.) is complete and accurate. Correct any discrepancies that may exist.
Use Alternative Resources:
- If the primary resource is not available, consider using alternative resources that can fulfill the requirements of the activity.
Consult SAP Notes:
- Check for any relevant SAP Notes or updates that may address this specific error message. SAP frequently releases updates that may resolve known issues.
Related Information
/SAPAPO/PPM
for production planning and /SAPAPO/RES
for resource management to investigate and resolve the issue.By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PPM_MAINTAIN546
Missing setup key/setup group at operation &1 for set setup ind. for act.
What causes this issue? In operation &1, you have selected an activity as a setup activity. This is only permitted in conjunction with a setup gr...
/SAPAPO/PPM_MAINTAIN545
Maintain a location in PPM &1 because the plan is location-dependent
What causes this issue? Your plan is location-dependent. You should therefore maintain a location for all the product-plan assignments which are rele...
/SAPAPO/PPM_MAINTAIN548
Campaign-relevant resource &1 &2 &3 &4 must not be secondary resource
What causes this issue? You have used a <DS:DE./SAPAPO/CRES_CAMPAIGN_PPDS>Campaign-Relevant Resource</> as a <DS:GLOS.3526C53AAFAB52B9...
/SAPAPO/PPM_MAINTAIN549
Variable continuous consumption of resource &1 &2 &3 &4 less than 0.001
What causes this issue? The value of the variable continuous consumption of the specified resource is less than 0.001 if the minimum lot size of the ...
Click on this link to search all SAP messages.