Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PPM_MAINTAIN -
Message number: 532
Message text: Bottleneck op. &1 contains non-bottleneck primary res. &4 in mode &2 &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PPM_MAINTAIN532
- Bottleneck op. &1 contains non-bottleneck primary res. &4 in mode &2 &3 ?The SAP error message
/SAPAPO/PPM_MAINTAIN532
indicates that there is a bottleneck operation in your production planning process that is associated with a primary resource that is not classified as a bottleneck. This can lead to inconsistencies in your planning and scheduling processes.Cause:
- Resource Configuration: The primary resource associated with the bottleneck operation is not set up correctly in the system. It may not be marked as a bottleneck resource, or it may have incorrect capacity settings.
- Planning Mode: The operation is being planned in a mode that does not align with the resource's capabilities or constraints.
- Data Inconsistencies: There may be inconsistencies in the master data related to the resources, operations, or modes.
Solution:
Check Resource Settings:
- Go to the resource master data and verify the settings for the primary resource (
&4
). Ensure that it is correctly defined and that its capacity is set appropriately.- Ensure that the resource is marked as a bottleneck if it is supposed to be one.
Review Operation Settings:
- Check the operation (
&1
) in the production process and ensure that it is correctly linked to the appropriate resources.- Verify that the operation is set to use the correct mode (
&2
) and that the mode is compatible with the resource.Adjust Planning Parameters:
- Review the planning parameters and settings in the APO system to ensure that they align with the production requirements.
- If necessary, adjust the planning mode or the resource allocation to resolve the bottleneck.
Data Consistency Check:
- Perform a consistency check on the master data to identify any discrepancies that may be causing the issue.
- Use transaction codes like
/SAPAPO/RES01
to analyze resource utilization and/SAPAPO/PPM
for production planning.Consult Documentation:
- Refer to SAP documentation or notes related to bottleneck management and resource planning for additional insights and best practices.
Related Information:
By following these steps, you should be able to identify the root cause of the error and implement the necessary changes to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PPM_MAINTAIN531
Logical component &1 &2 &3 contains no alternative product
What causes this issue? No alternative product is maintained for this logical component. This is not possible.System Response The system issues an e...
/SAPAPO/PPM_MAINTAIN530
Maximum time difference in relationship &1 &2 - &3 &4 too small
What causes this issue? Maximum time difference for relationship is too small.System Response The system issues an error message and will not allow ...
/SAPAPO/PPM_MAINTAIN533
Consumption duration may only be maintained for continual mat. consumpt.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PPM_MAINTAIN534
No product-plan assignment has been created in the plan
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...