Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PPM_MAINTAIN -
Message number: 529
Message text: Calendar resource &1 &2 &3 &4 must also have a primary resource in mode
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PPM_MAINTAIN529
- Calendar resource &1 &2 &3 &4 must also have a primary resource in mode ?The SAP error message
/SAPAPO/PPM_MAINTAIN529
indicates that a calendar resource (in this case, identified by the placeholders &1, &2, &3, &4) is missing a primary resource in the specified mode. This error typically occurs in the context of Advanced Planning and Optimization (APO) when working with production planning and scheduling.Cause:
The error is caused by the following scenarios:
- Missing Primary Resource: The calendar resource you are trying to maintain does not have an associated primary resource defined for the specified mode. In SAP APO, a primary resource is essential for the system to understand how to utilize the calendar resource effectively.
- Incorrect Configuration: The configuration of the resource or the mode may not be set up correctly, leading to the absence of a primary resource.
- Resource Assignment Issues: There may be issues with how resources are assigned or linked within the system, leading to inconsistencies.
Solution:
To resolve this error, you can take the following steps:
Check Resource Configuration:
- Go to the resource master data in SAP APO and verify the configuration of the calendar resource.
- Ensure that a primary resource is assigned to the calendar resource for the specified mode.
Assign a Primary Resource:
- If a primary resource is not assigned, you need to assign one. This can typically be done in the resource master data maintenance transaction (e.g.,
/SAPAPO/RRP3
or/SAPAPO/RES01
).- Navigate to the relevant resource and check the "Modes" tab to ensure that a primary resource is defined.
Review Resource Modes:
- Ensure that the modes defined for the resource are correctly set up and that they correspond to the intended production processes.
Check for Inconsistencies:
- Review any recent changes made to the resource or calendar settings that might have led to this issue.
- If necessary, consult with your SAP Basis or technical team to check for any inconsistencies in the system.
Testing:
- After making the necessary changes, test the configuration by attempting to perform the action that previously triggered the error.
Related Information:
/SAPAPO/RRP3
(Resource Planning) and /SAPAPO/RES01
(Resource Master Data).By following these steps, you should be able to resolve the error and ensure that your calendar resource is properly configured with a primary resource.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PPM_MAINTAIN528
No variable capacity can be maintained for resource &1 &2 &3 &4
What causes this issue? A variable capacity consumption has been maintained for the resource specified. This is not allowed if a variable duration ha...
/SAPAPO/PPM_MAINTAIN527
No bucket capacity consumption maintained for resource &1 &2 &3 &4
What causes this issue? The resource specified is a SINGLE MIX, MULTI-MIX, BUCKET or TRANSPORT resource. No bucket capacity consumption has been main...
/SAPAPO/PPM_MAINTAIN530
Maximum time difference in relationship &1 &2 - &3 &4 too small
What causes this issue? Maximum time difference for relationship is too small.System Response The system issues an error message and will not allow ...
/SAPAPO/PPM_MAINTAIN531
Logical component &1 &2 &3 contains no alternative product
What causes this issue? No alternative product is maintained for this logical component. This is not possible.System Response The system issues an e...
Click on this link to search all SAP messages.